Government to buy another cargo of LNG to address gas crisis


Published: 03:44 8 August 2026
The government has decided to import one more cargo of liquefied natural gas (LNG) to maintain normal gas supply in the country. A day after the in-principle approval to import eight cargoes of LNG, the proposal to purchase one more cargo has been approved.
The proposal was approved in an online meeting of the Cabinet Committee on Government Procurement on Friday (7 August) afternoon. The meeting was presided over by Finance and Planning Minister Amir Khasru Mahmud Chowdhury.
A press release from the Finance Ministry said that the LNG cargo will be purchased from Singapore-based Aramco Trading Singapore Pte Ltd through a government-to-government (G2G) method.
Approval of eight cargoes the previous day
Earlier on Thursday, the Cabinet Committee on Economic Affairs gave in-principle approval to import eight cargoes of LNG through a direct purchase method without a tender.
Under four separate proposals of the Department of Energy and Mineral Resources, approval was given to purchase a total of eight cargoes of LNG from the UK, Australia, Malaysia and Oman, two each.
With the addition of a new cargo, the initiative to import LNG to normalize the gas supply situation has been further strengthened.
Crisis increases after fire at Maheshkhali terminal
Along with the ongoing war situation in West Asia, the gas crisis in the country has intensified due to a fire and technical malfunction at a floating LNG terminal in Maheshkhali.
Its operations were stopped after a fire broke out at the terminal on July 21. This reduced the supply of about 450 million cubic feet of gas to the national grid daily.
LNG imported by sea is converted into gas through Floating Storage and Regasification Units (FSRUs) and supplied to the national grid. There are two such floating terminals in Maheshkhali.
One of the terminal's power and control systems and data cables were damaged in the fire, and its operations were suspended for about two weeks.
After necessary repairs, the boiler of one unit of the terminal has been started. Gas supply has resumed on a limited scale from the terminal of Accelerate Energy since Thursday morning.
Advertisement
Most Readed - Finance & Trade
- Three-Day Mosquito Eradication Drive Begins in Savar's Bongaon
- Countless Decembers will come and go, but Sheikh Hasina will not return to the country: Rashed Khan
- Ronaldo faces risk of 6-month ban for leaving national team camp
- Houthis Claim Third Attack on Riyadh Airport; Aircraft Damaged
- Cybercriminals Claim to Possess Data of 19 Million Pathao Users; $400,000 Ransom Demanded
- Ronaldo shares emotional message upon Messi's retirement, expressing 'utmost respect'
- Nude Trump Sculpture ‘The Orange Plague’ at the European Parliament
- Jamuna Fertilizer Factory Shuts Down Again Just Two Days After Resuming Operations
- Over 100 minutes of footage cut from Rajinikanth’s ‘Jailer 2’
- Messi bids farewell with a goal and assists, showered with love by teammates
- No Relief in Fish, Chicken and Egg Prices, Low-Income People Under Pressure
- Price of Low-Tier Cigarettes Raised Again; 10 Sticks Now Cost Tk 65
- Love, Resentment and ‘Write to the Address of the Sky’: The Untold Story of Rudra and Taslima
- RAB Dissolved, SRB Begins Operations; Uniforms, Logos, and Vehicle Colors to Change
- Bangladesh Bank to provide up to Tk 20 lakh without collateral; here is which young entrepreneurs are eligible.
- "Jinnah's father sold fish; he was a Hindu": Fazlur Rahman's claim vs. historical records
- Sakib Ali: A Prominent Name in Bangladesh’s Diplomacy and Politics
- Raphinha Equals Messi's Record; Barcelona Makes History in 7-Goal Thriller
- Major blow for international students: Australia limits opportunities to bring families
- Government Offering Free AI Training




